GEC

GEC

ICO Ended
16,095 Views
GEC GreenEnergyCoin is a blockchain project focused on the energy sector of the global economy in the field of "Green Energy" - the production of electricity from renewable energy sources.

GEC is a product of the investment class blockchain. It is a derivative that uses both advanced financial and industrial technologies to produce and sell a product with high demand.

Such a product is electricity that is consumed and sold in the markets of countries that have a permanent deficit in the generated capacity and are dependent on its imports.

GEC is a blockchain project that combines investors who have decided to finance the construction of Solar Power Plants (SPP) by the crowdfunding model to get income from their usage.
6.3
TOTAL SCORE
7.3
ICO PROFILE

(weight: 45%)

1
TEAM PROOF

(weight: 20%)

Get widget
General
Website: Visit
White paper: Read
Bounty: Bounty
Pre-sale Time: 15 Oct 2018 - 15 Dec 2018
ICO Time: 09 Jan 2019 - 30 June 2019
Country: Netherlands
Token info
Ticker: GEC
Platform: Ethereum
Token Type: ERC20
Available for sale: 2,450,000,000 GEC (50.7%)
Financial
ICO Price: 1 GEC = 0.1 EUR
Accepting: ETH, BTC, Fiat
Soft cap: 320000000 GEC
Hard cap: 1400000000 GEC
04.2018
• Decision-making on the creation of a project for the construction of network solar power plants<br /> <br /> (SPP) in various regions of the World. Development of the concept and business plan.
05. 2018
• Development of a legal and business model for the GreenEnergyCoin project (GEC) in<br /> <br /> different jurisdictions, in different regions of the World.
06. 2018
• Negotiation with all project participants.<br /> <br /> • Development of a model of partnership between project participants.<br /> <br /> • Decision on issuing its own crypto currency (token) - GreenEnergyCoin (abbreviated - CEG),<br /> <br /> in order to attract investments for the GreenEnergyCoin project.<br /> <br /> • Decision on the financial operator of the project and on the issuer of its own crypto currency<br /> <br /> (token) - GreenEnergyCoin (CEG).<br /> <br /> • Approval of the "Stichting OFEK Hi-Tech Investment Foundation", Breda, the Netherlands -<br /> <br /> the financial operator of the project and the issuer of crypto-currency (token) -<br /> <br /> GreenEnergyCoin (abbreviated - CEG).
07. 2018
• Team building. Team building. Technical audit of the GreenEnergyCoin project (GEC).<br /> <br /> • Definition of favorable regions of the World, for the construction of network solar power plants<br /> <br /> (SPP).<br /> <br /> • Decision on the construction of three (3) network solar power plants (SPP) in Croatia, with a<br /> <br /> total capacity of 116 MW per hour:<br /> <br /> • Solar power plant - "South Adriatic-I": 15 MW / h,<br /> <br /> • Solar power plant - "North Adriatic-I" : 35 MW / h,<br /> <br /> • Solar power plant - "South Adriatic-II": 100 MW / h.<br /> <br /> • Technical and financial audit of the GreenEnergyCoin project (GEC).<br /> <br /> • Involvement of consultants and legal consultations with authorities in Croatia on conditions<br /> <br /> and requirements for the construction of three (3) network solar power plants (SPP) in<br /> <br /> Croatia, with a total capacity of 150 MW per hour.
08. 2018
• Start the development of a business project for the construction of three (3) network solar<br /> <br /> power plants (SPP) in Croatia, with a total capacity of 150 MW per hour.<br /> <br /> • Completion of the development of a business project for the construction of three (3) network<br /> <br /> solar power plants (SPP) in Croatia, with a total capacity of 150 MW per hour. Technical audit<br /> <br /> of the GreenEnergyCoin project (GEC)
09. 2018
• Preparation for pre-sale - PreICO tokens GreenEnergyCoin (GEC).<br /> <br /> • Marketing program in preparation for presale - PreICO of GreenEnergyCoin (GEC) tokens.<br /> <br /> • Continuation of consultations with authorities in Croatia on conditions and requirements for<br /> <br /> the construction of three (3) solar network power plants (SPP) in Croatia, with a total capacity<br /> <br /> of 150 MW per hour.<br /> <br /> -Consultations and negotiations with potential producers and suppliers of equipment and<br /> <br /> components necessary for the construction of three (3) network solar power stations (SPP) in<br /> <br /> Croatia, with a total capacity of 150 MW per hour, as part of the GreenEnergyCoin project<br /> <br /> (GEC).
10. 2018
• End of the marketing program in preparation for presale - PreICO of GreenEnergyCoin (GEC)<br /> <br /> tokens.<br /> <br /> • Start presale - PreICO of GreenEnergyCoin (GEC) tokens.<br /> <br /> • Start of registration of Green Energy Holding in Croatia, within the framework of the<br /> <br /> GreenEnergyCoin project.<br /> <br /> • Start of development of design and design estimates for the construction of a solar power<br /> <br /> plant (SPP ): "South Adriatic-I", 15 MW / h and grid solar power plant (SPP ): "North AdriaticI",<br /> <br /> 35 MW / h.<br /> <br /> • Start of execution of the contract, purchase of a land plot with the area of 145,000 m2, for the<br /> <br /> construction of SPP South Adriatic-I, 15 MW / h.
11. 2018
• Continuation of presale - PreICO GreenEnergyCoin (GEC) tokens.<br /> <br /> • The end of registration of Green Energy Holding in Croatia, within the framework of the<br /> <br /> GreenEnergyCoin project.<br /> <br /> • Purchase of a land plot with an area of 145,000 m2, for the construction of SPP South<br /> <br /> Adriatic-I, 15 MWh.<br /> <br /> • Signing of contracts with manufacturers and suppliers, for the supply of equipment and<br /> <br /> components required for the construction of three (3) network solar power plants (SPP) in<br /> <br /> Croatia, with a total capacity of 150 MW per hour, as part of the GreenEnergyCoin project<br /> <br /> (GEC).
11. 2018
• Continuation of presale - PreICO GreenEnergyCoin (GEC) tokens.<br /> <br /> • The end of registration of Green Energy Holding in Croatia, within the framework of the<br /> <br /> GreenEnergyCoin project.<br /> <br /> • Purchase of a land plot with an area of 145,000 m2, for the construction of SPP South<br /> <br /> Adriatic-I, 15 MWh.<br /> <br /> • Signing of contracts with manufacturers and suppliers, for the supply of equipment and<br /> <br /> components required for the construction of three (3) network solar power plants (SPP) in<br /> <br /> Croatia, with a total capacity of 150 MW per hour, as part of the GreenEnergyCoin project<br /> <br /> (GEC).
12.2018
• End of PreICO of GreenEnergyCoin (GEC) tokens.<br /> <br /> • The planned receipt of investments from pre-sale - PreICO GreenEnergyCoin (GEC) tokens<br /> <br /> in the amount of sixteen (16) million EUR.<br /> <br /> • Start preparation of sales organization - ICO tokens GreenEnergyCoin (GEC).<br /> <br /> • Beginning of construction and installation works for the first grid of a solar power plant (SPP ):<br /> <br /> "South Adriatic-I", 15 MW / h.
01.2019
• Supply of equipment and components required for the construction of a grid solar power plant<br /> <br /> (SPP ): South Adriatic-I, 15 MW / h, under the GreenEnergyCoin project (GEC).<br /> <br /> • Start of the process of connecting the grid solar power plant "South Adriatic-I", 12 MW / hr to<br /> <br /> the energy system of Croatia.<br /> <br /> • Preparation of sales organization - ICO tokens GreenEnergyCoin (GEC).<br /> <br /> • Continuation of construction and installation works for a grid solar power plant (SPP): "South<br /> <br /> Adriatic-I", 15 MW / h.<br /> <br /> • Listing of GreenEnergyCoin (GEC) tokens on cryptocurrancy exchanges.
02.2019
• Start of public sale - ICO of GreenEnergyCoin (GEC) tokens.<br /> <br /> 24<br /> <br /> • Development of design and design estimates for the construction of a solar power plant<br /> <br /> (SPP ): "South Adriatic-II", 100 MW / h and "North Adriatic-I", 35 MW / h<br /> <br /> • Buying in property; land plot with the area of 923516 m2, for the construction of the South<br /> <br /> Adriatic-II SPP , 100 MW / h, and a land plot of 330,000 m2, for the construction of Northern<br /> <br /> Adriatica-I SPP , 35 MWh.<br /> <br /> • Continuation of construction and installation works for a grid solar power plant (SPP): "South<br /> <br /> Adriatic-I", 15 MW / h.
03.2019
• Beginning of construction and installation works for grid solar power plants (SPP): "South<br /> <br /> Adriatic-II", 100 MW / h and "North Adriatic-I", 35 MW / h<br /> <br /> • Supply of equipment and components required for the construction of network solar power<br /> <br /> plants (SPP): "South Adriatic-II", 100 MW / h and "North Adriatic-I", 35 MW / h, under the<br /> <br /> GreenEnergyCoin (GEC) project.<br /> <br /> • Supply of additional equipment necessary for the construction of network solar power plants<br /> <br /> (SPP): "South Adriatic-I", 15 MW / h, "South Adriatic-II", 100 MW / h and "North Adriatic-I", 35<br /> <br /> MW / h, in the framework of the GreenEnergyCoin project (GEC).
04.2019
• Completion of construction and installation works of the network solar power plant (SPP ):<br /> <br /> "South Adriatic-I", 15 MW / h.<br /> <br /> • Connection of grid solar power plants (SPP ): "South Adriatic-I", 15 MW / h, to the energy<br /> <br /> networks of Croatia.<br /> <br /> • Start of operation "South Adriatic-I", 15 MW / h, in test mode.
05.2019
• Commissioning of a grid solar power plants (SPP ): "South Adriatic-I", 15 MW / h, with<br /> <br /> reaching the designed capacity.<br /> <br /> • Completion of construction and installation works for grid solar power plants (SPP ): "South<br /> <br /> Adriatic-II", 100 MW / h and "North Adriatic-I", 12 MW / h.<br /> <br /> • Connection of grid solar power plants (SPP ): "South Adriatic-II", 77 MW / h and "North<br /> <br /> Adriatic-I", 35 MW / h to the energy networks of Croatia.<br /> <br /> • Start of operation of grid solar power plants (SPP ): "South Adriatic-II", 77 MW / h and "North<br /> <br /> Adriatic-I", 35 MW / h, in test mode.
06.2019
• Commissioning of grid solar power plants "South Adriatic-II", 77 MW / h, and "North AdriaticI",<br /> <br /> 35 MW / h with their reaching the designed capacity.
07.2019
• Starting from 01.07.2019, all three (3) grid solar power plants "South Adriatic-II", 100 MW / h,<br /> <br /> "North Adriatic-I", 35 MW / h, and "South Adriatic-I", 15 MW / h are fully commissioned and<br /> <br /> areunder full operation with using full production capacity.<br /> <br /> • End of public sale of GreenEnergyCoin (GEC) tokens - ICO.<br /> <br /> • Listing of GreenEnergyCoin (GEC) tokens on crypto currency exchanges.
Screenshots taken on 23 Sep 2018
Arkadi Priymak
CSO
No participating data
Sergii Ivanov
CEO
No participating data
Aliaksandr Samoila
CCO
No participating data
Anthony Meyers
COO
No participating data
Milan Markovic
CTO
No participating data
Yaroclav Pasichnychenko
CMO
No participating data

Advisors (0)

HEIGHT - 0px
WIDTH - 0px
PUT THIS CODE TO YOUR WEBSITE
ICO List
Other Interesting ICOs
Pre-Sale
2GETHER
2gether is developing the bank of the future, a future where; consumers take full ownership and control of the services they use, move beyond solely interacting with euros and dollars and fully embrace cryptocurrencies and digital assets, and augment their financial decisions through the use of exponential technologies like artificial intelligence, big data and blockchain. We are on a mission to change the way people interact with their finances. We are building a modern mutual organisation where everyone is an owner of their banking experience.
Upcoming
Safein
Safein is a blockchain-based single sign-on identity management platform ensuring security, comfort and trust for our customers. With Safein, users can easily demonstrate their true identity online where needed and control the extent of their personal data given out to various service providers.
Upcoming
Ultrain
Ultrain Technology Limited is the next generation public-blockchain technology venture that focuses on building a high performance decentralized blockchain platform through its programmable tech-infrastructure. Ultrain is committed to construct a responsible and sustainable commercial ecosystem that enables all industrial applications. With its groundbreaking innovations in cryptography and based upon a complete decentralized public network, Ultrain is able to provide multi-folds more advanced technical performance to fundamentally solve the performance and scalability issues comparing to other traditional public blockchain platforms.
Upcoming
Innovasis Hotels
Blockchain Hotels will give the community of blockchain enthusiasts and digital nomands a great place to stay and a chance to capitalize on the current opportunities in the hospitality market. The business model employed by Blockchain Hotels allows our investors and guests to benefit from real estate profit-sharing as well as from the token model that is tradable on exchanges. Our system is designed to deliver both short and long term gains. The guest experience is designed to be entertaining, stimulating, and relaxing at the same time. The hotel facility and co-working spaces are designed to bring people together, and feature numerous attractions for guests to enjoy. Blockchain Hotels team prepared exclusive 4 video series where there is everything explained. Here you can watch it: http://bit.ly/videocampaign-blockchainhotels
Upcoming
DocTailor
DocTailor is a unique self customizing smart legal contract platform, that allows, lawyers, individuals and organizations to send and create legal tailor-made smart contracts and agreements on the blockchain without developer experience.Bridging the gap between the trillion dollar crypto economy market.
Active
Liker
LIKER WORLD is a block-chain-based educational content platform. This is accompanied by a donation policy related to educational projects. Innovation in future education through technology is oriented towards a better society and humanity. Based on the idea that all corporate activities should pursue social values, LIKER has 3 main aspects: TRUST, REWARD, and DONATION.